Insight · requirements

The requirement nobody can find

A traceability matrix built for an auditor is a document. One built for the next change is a tool.

6 Jun 2026 · By Ben Yeung · requirements / traceability / governance / delivery
The requirement nobody can find

Six hundred rows, four columns, and a tab called Coverage. It was produced for a gate review, signed off, and never opened again — except by the one person who had to prove it existed.

Meanwhile, a change arrived: a regulatory tweak to how a fee is disclosed. Nobody could say, in under a day, which screens, reports and interfaces would be affected. The matrix had the answer and the matrix was useless, because it was organised by requirement rather than by the thing that changes.

Build it backwards

A matrix that starts from requirements answers “is this requirement covered?” once, at a gate. A matrix that starts from artefacts — screens, endpoints, reports, jobs, tables — answers “what breaks if I touch this?” every week.

The reverse index is the useful half. Requirement to artefact is a compliance exercise; artefact to requirement is an engineering tool. Both come from the same data, and only one of them gets used.

A requirement matrix built backwards from evidence and test, with four categories that must be traced continuously
↔ Swipe to see the full diagramA gate document built forwards against a working trace built backwards from the evidence, and the four categories that must be traced.

Trace the twelve that matter

Not everything needs tracing. Regulatory obligations, contractual commitments, safety and money — those need an unbroken line from the clause to the test that proves it. The rest needs a link that is good enough to survive a change request.

Twelve to twenty traced requirements is a working list. Six hundred is an archive, and an archive is trusted by nobody, because everyone knows it was not maintained after the gate.

What keeps it alive

The matrix has to be a by-product of work people already do. If updating it is a separate task, it dies within a release. Link the artefact identifier in the ticket, generate the matrix from those links, and the matrix becomes a report rather than a deliverable.

The test is a question asked in a normal week: someone proposes a change to one endpoint, and within an hour the team can name the requirements it serves, the tests that cover it, and the two other systems that will notice. If that takes a meeting, the matrix is decoration.

Ben Yeung

Ben Yeung

MBA & BEng · Technology & Digital Transformation

Writes about what drives decisions that bring value to humans.

Connect on LinkedIn →

Working through this now?

Tell us where it hurts and we will tell you what we would do first.

Start a conversation
CONTACT US

We provide a custom made service for just drop us a line.
We would be glad to have feedback from you.