Requirements Portfolio

Confidential — Integrated Resort Operations

Snapshot
Inputs
Just over fifty requirements from PMO, weekly and dated-list intake
Model
5 dimensions: reach, gaming loop, spend link, dependency and value
Role
Portfolio analysis and facilitation
Roles involved
PMO, product, delivery and architecture
Deliverables
Scoring model, sized portfolio, P1–P4 bands and top-value shortlist
NDA
Client name withheld. Artefacts are described at a structural level; client content is not reproduced.
50+
Requirements
5
Dimensions
~2/5
In P1–P2

Problem

The programme had just over fifty requirements arriving through three intake routes — the PMO pipeline, a dated business list and ad-hoc weekly requests. There was no shared way to compare them. Sizing drifted because it used three different bases: some requirements followed a ladder, some defaulted to the smallest size, and some were stated as a single number. Without a shared model, the order was set by volume or escalation rather than by value.

Approach

Each requirement was scored on four dimensions — reach, gaming loop, spend link and dependency — and given a value score from 1 to 10. Each was sized on a T-shirt ladder with an effort range in months. The result was a portfolio, not a ranked list: roughly two-fifths in P1–P2, roughly a third in P4, the rest in P3, with most requirements sized S and only a handful sized XL or XXL.

Figure 1 — Four dimensions, one value score

Five dimensions, one value scoreReach, gaming loop, spend link and dependency feed a value score from one to ten; effort is sized separately into P1 to P4 bands. Four dimensions score value; effort is sized beside it ReachGaming loopSpend linkDependencyValue1–10Effort: T-shirt + monthsS / M / L / XL / XXLPortfolio bandsP1–P2 · P3 · P4The value score is not a substitute for judgement; it makes the judgement explicit and comparable.

What we delivered

01
Scoring model
Four dimensions with explicit definitions, plus a 1–10 value score.
02
Sized portfolio
Every requirement, each with a T-shirt size and an effort range in months.
03
Value bands
P1–P2, P3 and P4, with counts and a top-value shortlist.
04
Portfolio view
Value against effort, so the fast wins and the heavy bets are visible together.

Artefacts are described at a structural level. Client content, names and commercial figures are withheld.

Impact

The model gave the programme a defensible starting portfolio. It showed that value was not a proxy for size: the two highest-value requirements were L and XL, but several S items also scored 9. It also exposed the long tail: roughly a third of requirements sat in P4, which made the cost of saying yes visible.

This page describes the portfolio model and its output. It does not claim revenue or adoption outcomes.

Figure 2 — Value versus effort, every requirement

Value versus effortEach dot is one requirement; colour shows the P1 to P4 band. Value versus effort — every requirement, one portfolio 2468100.5123456Effort (months)ValueOne requirement — L, 2.0 months, value 10One requirement — XL, 3.0 months, value 10One requirement — S, 0.5 months, value 9One requirement — S, 0.5 months, value 9One requirement — M, 1.0 months, value 9One requirement — L, 2.0 months, value 9One requirement — L, 2.0 months, value 9One requirement — XL, 5.0 months, value 9One requirement — S, 0.5 months, value 8One requirement — S, 0.5 months, value 8One requirement — S, 0.5 months, value 8One requirement — S, 0.5 months, value 8One requirement — S, 0.5 months, value 8One requirement — S, 0.5 months, value 8One requirement — L, 2.0 months, value 8One requirement — S, 3.0 months, value 8One requirement — M, 3.0 months, value 8One requirement — XXL, 6.0 months, value 8One requirement — S, 0.5 months, value 7One requirement — S, 0.5 months, value 7One requirement — S, 0.5 months, value 7One requirement — S, 0.5 months, value 7One requirement — M, 2.5 months, value 7One requirement — XL, 3.0 months, value 7One requirement — S, 0.5 months, value 6One requirement — S, 0.5 months, value 6One requirement — S, 0.5 months, value 6One requirement — S, 0.5 months, value 6One requirement — S, 0.5 months, value 6One requirement — S, 1.0 months, value 6One requirement — M, 2.0 months, value 6One requirement — S, 0.5 months, value 5One requirement — S, 0.5 months, value 5One requirement — S, 0.5 months, value 5One requirement — S, 0.5 months, value 5One requirement — S, 0.5 months, value 5One requirement — S, 0.5 months, value 5One requirement — XL, 1.0 months, value 5One requirement — L, 2.0 months, value 5One requirement — S, 0.5 months, value 4One requirement — S, 0.5 months, value 4One requirement — S, 0.5 months, value 4One requirement — M, 2.0 months, value 4One requirement — S, 2.0 months, value 4One requirement — S, 2.0 months, value 4One requirement — S, 4.0 months, value 4One requirement — S, 4.0 months, value 4One requirement — S, 0.5 months, value 3One requirement — S, 0.5 months, value 3One requirement — S, 0.5 months, value 3One requirement — S, 0.5 months, value 3One requirement — S, 0.5 months, value 2One requirement — S, 0.5 months, value 2One requirement — S, 0.5 months, value 2One requirement — XL, 3.0 months, value 2One requirement — S, 0.5 months, value 1Highest valueHighest value, lower effortP1–P2P3P4